Plan the lab around the move date.

Your new space has to fit the building, the science already underway, and the move date your team is working toward. We plan research labs and the offices around them for growing biotech companies.

Your facilities and engineering team is moving a working science operation into new space. We plan around the move date, research that cannot stop, and inspection requirements that need attention early.

What the plan protects

Plan for the move, protect the work

A lab is a working instrument, not a showpiece. The plan has to account for the move, ongoing research, and what the next experiment may require.

Move date

We identify long-lead systems in schematic design and show testing, balancing, and commissioning as a schedule phase before move-in.

Research continuity

We work with your science team and specialist movers on a phased transition, with overlap so research can continue at both sites.

Room to change

Overhead service carriers, mobile benches, and spare mechanical, electrical, and plumbing (MEP) capacity leave room for new equipment.

What we do

Services, in the order you need them

We start by checking the building, then plan the lab, design the space, and carry the work through commissioning.

Space programming and lab planning

We map sample flow, people flow, waste streams, and clean and dirty separation before drawing rooms.

Feasibility studies and building selection support

Before you commit to a building, we check whether it can carry your labs, air handling, and power needs.

Lab and office design

Our standard lab uses overhead service carriers, mobile benches, and spare MEP capacity. Our MEP partners design lab systems as their main work.

Long-lead equipment and critical path planning

We identify air handling units, fume hoods, generators, and gas systems in schematic design so ordering can start before drawings are finished. Each schedule shows testing, balancing, and commissioning as a separate phase before move-in.

Early code and inspector meetings

We meet the fire marshal and building department during design, not at permit. We design spaces to meet applicable codes and standards.

Phased move and dual-site planning

We plan the sequence with your science team and specialist movers. Non-critical labs can move first, then core labs, with research continuing at both sites during the overlap. Specialist movers carry the equipment; we plan around the move.

Construction administration through commissioning

We stay through testing, balancing, and commissioning. Complete means the systems work, not only that the keys changed hands.

Industries

Sectors we serve

Growing biotech companies moving into new lab space, with labs and offices in the same building.

We do not take office-only projects, act as general contractor, or move equipment and specimens ourselves.

Start a conversation

Considering a building?

Start with a feasibility study. We check whether the building can carry the labs, air handling, and power you need.

Start with a feasibility study